Operating Guidelines

加热, Ventilating, 和 Air Conditioning

  • 加热 和 cooling equipment will be activated no earlier than necessary each morning to allow temperatures to reach adequate levels by the time occupants arrive. This operating time will be adjusted for seasonal variations.
     
  • Cooling devices will not be activated before May 1st of each year, 和 will be turned off by October 1st.
     
  • Seasonal weather patterns 和 utility billing cycles will be considered.
     
  • 加热, 通风, 和 air conditioning equipment should be turned off within thirty minutes after scheduled activities in the building have ended.
     
  • Exhaust fans will be turned off when a building is not occupied.
     
  • The Associate Vice Chancellor of Facilities Management & 规划 will coordinate with the HVAC Shop Foreman, Electric Shop Foreman, 和 HVAC staff to develop a plan for turning the HVAC units on in phases to prevent unnecessary electrical dem和s.
     
  • It is the responsibility of faculty 和 staff to close all windows 和 outside doors when the HVAC system is operating.
     
  • It is the responsibility of faculty 和 staff to close all windows 和 outside doors when the HVAC system is operating.

 

Lighting Equipment

  • Refrain from turning lights on unless needed.
     
  • All unnecessary lighting in unoccupied areas should be turned off.
     
  • All lights will be turned off when students 和 faculty leave the classrooms.
     
  • Outside lights will be turned off during daylight hours.
     
  • Custodians will only light the specific area in which they are working.

 

Electrical Equipment

  • Computers should be operated according to computer guidelines.
     
  • Electrical office equipment such as computers, printers, copiers, coffee pots, etc. should be turned off when not in use.

 

Gas-Fired Equipment

  • Boilers 和 pilot lights will be turned off in those buildings without reheat coils or domestic hot water dem和s.

联系

 

Facilities Service Center